Timelapse of the roof install coming soon.
Wednesday, July 31, 2013
Thursday, July 18, 2013
Exterior Walls
In less than 4 days the exterior walls of the house were delivered and installed.
Time lapse of the SIPs delivery and wall install.
Kitchen windows.
Andrew, Lauren, and Avery in Andrew's room.
Saturday, July 13, 2013
Concrete Slab
The day started early with the pump truck arriving at 5:30 AM. The first of four concrete trucks showed up around 6:00 AM.
Adding the color that Lauren chose. (In actuality, she just happened to choose the same color that we had already selected, but she loves saying that she chose the color for our floors, so we'll give her those bragging rights.)
Pumping the concrete.
Power troweling the slab.
Time lapse video of the whole day.
Monday, July 1, 2013
Subscribe to: