Tuesday, November 26, 2013

Almost Done

Kitchen cabinets installed.
Going to pickup the counter tops tomorrow.

Friday, October 11, 2013

Septic Tanks Installed.

Septic and Pump tanks on the truck.
 Tanks in the hole.
Need to connect the plumbing and then backfill.

Sunday, October 6, 2013

Geothermal Earth Loops

Geothermal Earth loops trenches dug.
 The holes are 6' deep and 3' wide.

 300' of trench in the front yard.
We also dug the septic tank hole.

Tuesday, October 1, 2013

Thursday, September 12, 2013

Siding Almost Done

Exterior siding.

All exterior windows and doors are in.  Roof is on.  Plumbing and electrical rough-in will be completed next week.  Then interior wall insulation for sound and then drywall.

Wednesday, July 31, 2013

Roof Raised!

All roof panels are installed.

Timelapse of the roof install coming soon.